Steel frame cladding: new doors without demolition and dust
Almost everywhere in blocks of flats and in older houses there are steel door frames. When replacing doors, many people want to demolish them, which means chasing into the wall, dust, new plaster and painting. There is, however, a simpler solution: cladding of the original steel door frame.

How door frame cladding works
The original steel door frame stays in the wall. We cover it with a new made-to-measure casing in the same decor as the new interior doors. The result looks like a new adjustable door frame, but without any demolition work.
Advantages of steel frame cladding
- no chasing, dust or new plaster,
- installation is quick and you can carry on using the flat,
- the door frame and doors have the same decor,
- lower costs than demolishing the door frame and repairing the wall.
What to bear in mind
Cladding a steel door frame reduces the structural opening by approximately 3 cm on each side. We therefore adapt the door size during the on-site measurement, which we do free of charge. We make both the door and the cladding to measure, so you need not worry that they will not fit.
You will find our range of doors and decors on the page Interior doors and door frames.
More tips on interior doors
Need advice?
Call us on 0903 231 742 or drop by our shop in Bratislava, our showrooms in Trnava or Žilina, or directly at our production site in Čachtice. You will find all contact details on the Contact page. You can also create a price quote yourself in the door visualizer.